Updated: Sunday December 8, 2024

Code Enforcement Violation Records

Old Fort Lowell Neighborhood

If there is a number in the Days Open column on the right, the case is open and beng worked by CE. Some cases
have been transferred to another unit of government or to the courts. Sometimes the status has not been updated.
Listing is limited to most recent 300 cases.

Location of Violation Date
Entered
Type Status*Description Code Enforcement
Activity No.
Days
Open
5301 E Fort Lowell Rd 10-22-24 Building Received Hpz : Renovations To The Property Are Not Being Followed By The Fort Lowell Historic Preservation Zone Requirements, The Concerns Are The Stucco And The Windows. CE-VIO1024-04258 47
5701 E Glenn St 09-30-24 Prop Maint Active Pmmult/ Unit 102 Leak In Property Carpet Is Wet CE-VIO0924-03970 69
5360 E Fort Lowell Rd 07-05-24 Building Closed - Unfounded Hpz / Work Outside Remodel Site Wall, Construction To Historic Property CE-VIO0724-02612
2811 N Rosemont Av 12-15-23 Zoning Active Rwop / Business Ran Out Of Home Storage Containera And Porta Potty (Without Any Service) On Property CE-VIO1223-06902 359
5124 E Fort Lowell Rd 07-17-23 Zoning Active Rwop / Add Wood Course To Top Of Exiting Block Above 6ft High Without Permit CE-VIO0723-04575 510
2912 N Cloverland Av 07-10-23 Building Active Mult / Studio Built In Back Of Property Without Permit, Over Grow Trees Unmaintained, Trash And Refuse In Alley CE-VIO0723-04446 517
4750 E San Francisco Bl 04-27-23 Other Active Rwop : Building A Black Metal Wall Over 6 Ft Tall Without Permit On The West Side Of The Property 12/27/2023 Property Added Flood Light, The Light Is Not Angled At 45 Degrees And There'S No Shielding To Prevent Light From Encroaching Into Neighboring Properties. CE-VIO0423-03190 591
2821 N Cloverland Av 03-14-23 Prop Maint Active Mult / Flat Bed Trailer In Front Of Property Filled With Trash, Refuse And Debris, Excessive Outside Storage In Car Port CE-VIO0323-02365 635
5425 E Fort Lowell Rd 09-27-22 Zoning Active New Ac Unit And Duct Work On Roof Without Permit. Plaster Work On Structure Without Hpz Approval. T22DV05587 803

Clicking on the activity number will bring up more information about a particular case.

*StatusDescription
 
ActiveNewly opened case where inspection is not yet completed
CitationCase is open, owner has not responded to Notice of Violation therefore a citation has been issued
Closed-ResolvedCompliant with requirements - case closed
Closed-UnfoundedNo valid violation or problem solved before inspection - no further action taken - case closed
ObserveTypically used for cases where the owner is granted time to comply either though an appeal or other administrative extensions where the inspector is not required to inspect every 30 days.
PendingCase opened, violation(s) identified and Notice of Violation has been mailed out. Waiting for compliance.
ReceivedCase opened but not yet assigned for inspection - to better control workloads
ReferredCase sent to other City department

Date Entered - Date a new case was opened by entering complaint information into the computer system. The goal is to open the case within 24 hours of receiving the complaint. Tucson City Code Enforcement Division. Latest code enforcement violations. Index to neighborhoods.

Software by Donald Ijams. Hosted by Harold Hallikainen, harold@w6iwi.org