Code Enforcement Violation Records

Flowing Wells Neighborhood

If there is a number in the Days Open column on the right, the case is open and beng worked by CE. Some cases
have been transferred to another unit of government or to the courts. Sometimes the status has not been updated.
Listing is limited to most recent 300 cases.

Location of Violation Date
Entered
Type Status*Description Code Enforcement
Activity No.
Days
Open
3333 N Flowing Wells Rd 04-25-24 Other Active Tpd Reported Underground Electrical Being Conducted Without Permits CE-VIO0424-01511 13
3160 N Sioux Av 04-10-24 Prop Maint Active Refs / Cut Tree Limbs, Tires, Pottery, Mattress And Trash Trash In Alley Back Of Property, Jmv With Flat Tires In Front Of Property CE-VIO0424-01317 28
1635 W Roger Rd 03-19-24 Min Housing Closed - Resolved Rmin / Multiple Units With Puddling Sewage In Yard Areas Causing Nuisance And Terrible Smell CE-VIO0324-01070
3431 N Flowing Wells Rd 03-13-24 Prop Maint Closed - Resolved Pmmult / Dried Vegetation, Overgrown Trees And Oleander Trees Along W Mohave Rd CE-VIO0324-01004
941 W Farr St 03-08-24 Other Active Call From 911 For Tpd Living Condition CE-VIO0324-00943 61
1132 W Mcmillan St 03-05-24 Building Active Rwop / Block Wall Installed In Back Of Property Without Permit And Left Remaking Block And Cement Debris In Behind Wall Blocking The Alley CE-VIO0324-00897 64
1509 W Gretchen Dr 02-28-24 Zoning Active Zres : Running A Pet Groom Business CE-VIO0224-00807 70
1635 W Roger Rd 01-23-24 Prop Maint Active Mult : Sewage Drainage In The Pipes In The Ground, Needs Root Cutting / Live Electrical Wires Sticking Out Of The Ground CE-VIO0124-00319 106
1612 W Fort Lowell Rd 01-10-24 Building Property Maintena Active Continued Case From T21dv04391, Vacant And Neglected Structure, Work Without Permits And Property Maintenance Violations. CE-VIO0124-00171 119
1635 W Roger Rd 11-28-23 Building Active {Activity Date: 04/08/2021- Status: Approved- Inspector: Gonzalez- Comment: Entered By Gonzalez - Upon Arrival At The Reported Address, Unit 13 Has New Drywall Through The Unit And Pending For More To Be Completed. There Are New Non-Metallic Sheathing Conductors Inside The Bare Walls, That Can Visibly Be Seen From The Front Door Way. The Non-Metallic Sheathing'S Date Stamp To The Exterior Lighting Shows 12/11/2020 And 8/4/2020. The Power To The Mobile Home Has Been Turned Off At The 50-Amp Main Breaker Inside The Pedestal. There Are New Wall Studs And Ceiling Rafters Inside The Mobile Home That Can Be Seen From The Non-Completed Drywall Area. There Are No Permits On File For The Repairs That Are Being Made At This Unit, A Stop Work Order Placard Has Been Posted On Site, The Notice Of Violation To Obtain Permits Has Been Left At The Office Drop Box. Property Manager Has Been Notified To Keep Power Off At The Mobile Home Pedestal And All Works Is To Cease Until Proper Permits Are Obtained. At The Other Reported Units, There Is No Active Work In Or Around Unit 17 At This Time. At Unit 10 There Is Only Signs Of The Roof Being Recoated, This Repair Doesn'T Require A Permit To Be Obtained From The City Of Tucson. } CE-VIO1123-06646 162

Clicking on the activity number will bring up more information about a particular case.

*StatusDescription
 
ActiveNewly opened case where inspection is not yet completed
CitationCase is open, owner has not responded to Notice of Violation therefore a citation has been issued
Closed-ResolvedCompliant with requirements - case closed
Closed-UnfoundedNo valid violation or problem solved before inspection - no further action taken - case closed
ObserveTypically used for cases where the owner is granted time to comply either though an appeal or other administrative extensions where the inspector is not required to inspect every 30 days.
PendingCase opened, violation(s) identified and Notice of Violation has been mailed out. Waiting for compliance.
ReceivedCase opened but not yet assigned for inspection - to better control workloads
ReferredCase sent to other City department

Date Entered - Date a new case was opened by entering complaint information into the computer system. The goal is to open the case within 24 hours of receiving the complaint. Tucson City Code Enforcement Division. Latest code enforcement violations. Index to neighborhoods.