Updated: Wednesday May 8, 2024
If there is a number in the Days Open column on the right, the case is open and beng worked by CE. Some cases
have been transferred to another unit of government or to the courts. Sometimes the status has not been updated.
Listing is limited to most recent 300 cases.
Location of Violation | Date Entered | Type | Status* | Description | Code Enforcement Activity No. | Days Open |
---|---|---|---|---|---|---|
3333 N Flowing Wells Rd | 04-25-24 | Other | Active | Tpd Reported Underground Electrical Being Conducted Without Permits | CE-VIO0424-01511 | 13 |
3160 N Sioux Av | 04-10-24 | Prop Maint | Active | Refs / Cut Tree Limbs, Tires, Pottery, Mattress And Trash Trash In Alley Back Of Property, Jmv With Flat Tires In Front Of Property | CE-VIO0424-01317 | 28 |
1635 W Roger Rd | 03-19-24 | Min Housing | Closed - Resolved | Rmin / Multiple Units With Puddling Sewage In Yard Areas Causing Nuisance And Terrible Smell | CE-VIO0324-01070 | |
3431 N Flowing Wells Rd | 03-13-24 | Prop Maint | Closed - Resolved | Pmmult / Dried Vegetation, Overgrown Trees And Oleander Trees Along W Mohave Rd | CE-VIO0324-01004 | |
941 W Farr St | 03-08-24 | Other | Active | Call From 911 For Tpd Living Condition | CE-VIO0324-00943 | 61 |
1132 W Mcmillan St | 03-05-24 | Building | Active | Rwop / Block Wall Installed In Back Of Property Without Permit And Left Remaking Block And Cement Debris In Behind Wall Blocking The Alley | CE-VIO0324-00897 | 64 |
1509 W Gretchen Dr | 02-28-24 | Zoning | Active | Zres : Running A Pet Groom Business | CE-VIO0224-00807 | 70 |
1635 W Roger Rd | 01-23-24 | Prop Maint | Active | Mult : Sewage Drainage In The Pipes In The Ground, Needs Root Cutting / Live Electrical Wires Sticking Out Of The Ground | CE-VIO0124-00319 | 106 |
1612 W Fort Lowell Rd | 01-10-24 | Building Property Maintena | Active | Continued Case From T21dv04391, Vacant And Neglected Structure, Work Without Permits And Property Maintenance Violations. | CE-VIO0124-00171 | 119 |
1635 W Roger Rd | 11-28-23 | Building | Active | {Activity Date: 04/08/2021- Status: Approved- Inspector: Gonzalez- Comment: Entered By Gonzalez - Upon Arrival At The Reported Address, Unit 13 Has New Drywall Through The Unit And Pending For More To Be Completed. There Are New Non-Metallic Sheathing Conductors Inside The Bare Walls, That Can Visibly Be Seen From The Front Door Way. The Non-Metallic Sheathing'S Date Stamp To The Exterior Lighting Shows 12/11/2020 And 8/4/2020. The Power To The Mobile Home Has Been Turned Off At The 50-Amp Main Breaker Inside The Pedestal. There Are New Wall Studs And Ceiling Rafters Inside The Mobile Home That Can Be Seen From The Non-Completed Drywall Area. There Are No Permits On File For The Repairs That Are Being Made At This Unit, A Stop Work Order Placard Has Been Posted On Site, The Notice Of Violation To Obtain Permits Has Been Left At The Office Drop Box. Property Manager Has Been Notified To Keep Power Off At The Mobile Home Pedestal And All Works Is To Cease Until Proper Permits Are Obtained. At The Other Reported Units, There Is No Active Work In Or Around Unit 17 At This Time. At Unit 10 There Is Only Signs Of The Roof Being Recoated, This Repair Doesn'T Require A Permit To Be Obtained From The City Of Tucson. } | CE-VIO1123-06646 | 162 |
Clicking on the activity number will bring up more information about a particular case. | ||
*Status | Description | |
---|---|---|
Active | Newly opened case where inspection is not yet completed | |
Citation | Case is open, owner has not responded to Notice of Violation therefore a citation has been issued | |
Closed-Resolved | Compliant with requirements - case closed | |
Closed-Unfounded | No valid violation or problem solved before inspection - no further action taken - case closed | |
Observe | Typically used for cases where the owner is granted time to comply either though an appeal or other administrative extensions where the inspector is not required to inspect every 30 days. | |
Pending | Case opened, violation(s) identified and Notice of Violation has been mailed out. Waiting for compliance. | |
Received | Case opened but not yet assigned for inspection - to better control workloads | |
Referred | Case sent to other City department | |
Date Entered - Date a new case was opened by entering complaint information into the computer system. The goal is to open the case within 24 hours of receiving the complaint. Tucson City Code Enforcement Division. Latest code enforcement violations. Index to neighborhoods. |